The huge vortex generator assembly 'one-piece lift' for the Hammersmith site was only possible because of the extensive design, development and research conducted by Steel Dynamics.
The Dormay Street Vortex Tube Installation was the "baby" of the Vortex Generator projects for Tideway West.
The Hammersmith Vortex Generator tilt-frame innovation ensures a safe and accurate lift of the 28 tonne product.